Gives requirements for instrumentation to monitor core cooling for safe operation of PWRs during cold shutdown operations when the coolant temperature is below 100 °C. Summarizes good international practices to be used when designing new or upgrading existing PWR core cooling monitors.
- You cannot add another "IEC 60317-17 Ed. 2.0 b:1990" to your cart. View cart
IEC 62117 Ed. 1.0 b:1999
Original price was: $234.00.$117.00Current price is: $117.00.
Nuclear reactor instrumentation – Pressurized light water reactors (PWR) – Monitoring adequate cooling within the core during cold shutdown
International Electrotechnical Commission , 12/10/1999
Pages: 51
















